DAMPAK KINERJA BURUH TERHADAP WAKTU TUNGGU DAN TINGKAT PEMANFAATAN DERMAGA SANDAR DI PPP TEGALSARI

Suryanto Suryanto, Hargiyatno Ignatius Tri, Wibowo Sandi, Triharyuni Setiya

Abstract


 

Jumlah kapal yang melakukan kunjungan di PPP Tegalsari meningkat dari tahun ke tahun, hingga pada tahun 2014 mencapai 4.237 unit kedatangan kapal yang membawa total hasil tangkapan 48 ribu ton. Salah satu masalah yang banyak dikeluhkan nelayan adalah lamanya waktu tunggu dan bongkar, hingga harus bermalam. Berdasarkan rencana induk PPP Tegalsari, diharapkan pada tahun 2020 memiliki panjang dermaga bongkar sepanjang 1.323 meter disamping prasarana lain yang mendukung. Penelitian yang dilaksanakan tahun 2014 ini bertujuan untuk mencari alternatif solusi di samping pengembangan dermaga sesuai rencana induk tersebut. Alternatif solusi tersebut didapatkan dengan melakukan reka ulang proses produksi PPP Tegalsari Tahun 2014 dengan bantuan perangkat lunak Arena versi 5 “Student Version”. Hasil studi menunjukan tingkat pemakaian dermaga skenario rencana induk tidak ekonomis karena hanya 10,7%. Dikawatirkan kinerja dermaga tersebut akan semakin merosot dengan diberlakukannyanya Permen KP No.2 Tahun 2016 tentang pelarangan penggunaan pukat hela (trawl) dan pukat tarik (seine nets). Studi memberikan alternatif solusi yang lebih bersifat sosial ekonomi dengan meningkatkan jumlah tenaga buruh bongkar dan pemecah es menjadi 200% dari semula dengan tetap menggunakan dermaga bongkar yang ada saat ini. Dampak dari solusi tersebut waktu kerja buruh menjadi lebih sesuai dengan UU Ketenagakerjaan No. 13 Tahun 2003, serta dwelling time rata-rata menurun dari 75,3 menjadi 59,3 jam/kapal atau penurunan 21%.

 

Titlle: Impact of Labour Utility to Dwelling Time and Berth Occupancy

Ratio in The Tegalsari Fishing Port

 

The number of vessels visiting coastal fishing port (PPP) of Tegalsari has been increased from year to year. In 2014, there were 4,232 vessels arrived and loaded 48 million tons of catches on the port. Length of dwelling time became the major problem causing nights delay. According to the master plan of PPP Tegalsari, it is planned that they will have a 1,323 meter of loading dock and other supporting facilities by 2020. This research was conducted in 2014 and it aims to find alternative solutions more than development of the dock which is already stated in the master plan. The alternative solution was obtained by simulating the production process of PPP Tegalsari based on 2014 fishing vessel arrival using the software of student version of Arena 5. The result showed that the dock occupancy ratio of the master plan is not economical because it is only 10.7%. It could be worsen with the enactment of the Marine and Fisheries Ministerial Regulation No.2/2016 on the prohibition of trawls and seine nets fishing. This study provides a more socio-economic alternative solution by increasing the number of unloading and ice-crushing workers to 200% from the 2014 condition using the existing berth. The solution gives a positive impact on worker’s working time which is conformed with Labour Law No. 13/2003. In addition, average of dwelling time decreased from 75.3 to 59.3 hour/vessel or 21% decreas.

 


Keywords


Dwellingtime; Utilitas_tenaga_kerja; Kinerja dermaga; Rencana induk; PPP Tegalsari

Full Text:

PDF


DOI: http://dx.doi.org/10.15578/jsekp.v12i2.5951

Indexed by:

 

-------------------------------------------------------------------------------------

Published by

Research Center for Marine and Fisheries Socio-Economic 
in collaboration with
Indonesian Marine and Fisheries Socio-Economics Research Network

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.